Demo site by Levelwork, showing what a general contractor's website can do. It doesn't take bookings yet.
WBWrenhollowBuilders
Mon to Fri 7:30 AM to 5 PM, Saturday estimates by appointment(770) 555-0148CallFree estimate

Services

Kitchen Remodeling in Roswell, Alpharetta and Johns Creek

A new layout, cabinets, counters and lighting, planned on paper and priced line by line before demolition starts.

White kitchen cabinets opening onto a bright dining and living room

Kitchen remodeling

Kitchen remodeling in Roswell usually starts with a kitchen that works on paper but not in daily life. The room is closed off from the rest of the house, the counters run out when two people cook, or the cabinets have reached the end of their life. A remodel replaces what no longer works for the way you cook and live. For some homes that means new cabinets and counters in the same layout. For others it means moving a wall, the sink or the range to open the room up. Either way, most of the price is set before anyone picks up a hammer.

Three choices set most of the price

  • The layout. Keeping the sink, the range and the dishwasher where they are costs less than moving them, because the plumbing, the wiring and the vent stay put.
  • The cabinets. Stock, semi-custom and custom cabinets differ in price, lead time and how well they fit an odd wall or a sloped ceiling.
  • The counters. Laminate, quartz and natural stone each carry a different price per foot, and the stone shop needs the cabinets set before it can measure.

We settle all three with you on paper before anything is ordered, and the written estimate shows each one on its own line.

The kitchens we see in North Fulton

Many homes in Roswell, Alpharetta and Johns Creek were built when the area grew quickly, with a formal dining room, a separate living room and a kitchen tucked behind a wall. The cabinets were builder-grade, the island is small or missing, and the lighting is one fixture in the middle of the ceiling. The most common request we get is to open that kitchen to the family room or the dining room and give it an island people can sit at.

Older houses near the Roswell historic district bring different work. Kitchens there are often smaller, the walls may hold older wiring or plumbing, and an earlier remodel may have left a patchwork of floors. We open one section, see what is behind it and price the rest from what we find, so the estimate rests on facts.

How a kitchen remodel goes

First we measure, plan the layout with you and pick the cabinets and the finishes. The orders go in and the permits are pulled while you still have a working kitchen. When the cabinets are ready to ship, the old kitchen comes out. Then the plumbing and the wiring are moved or updated, a beam goes in if a wall comes out, the walls are patched, the cabinets are set and the counters are measured and fitted. The tile, the lighting and the appliances go in last, and we walk the finished kitchen with you.

Living through it

We cover the floors on the way to the kitchen, hang dust barriers around the work and clean up at the end of each day. Your written schedule shows which working days you are without a kitchen, so you can plan meals around it. Many families use a folding table, a microwave and the old fridge in the dining room or the garage, and we can run a temporary sink there if the house allows it.

Orders and lead times

Cabinets, counters and some appliances can take weeks to arrive, and a late order is the most common reason a kitchen schedule slips. We place the orders as soon as you approve the plan, track each one, and start demolition only when the cabinets are ready to ship. If an order slips anyway, you hear about it from us the day we learn of it, with the new dates.

Your written estimate

The estimate lists demolition, cabinets, counters, plumbing, electrical work, finishes and the permits on separate lines. If a refresh of the same layout would give you most of what you want, its price sits beside the full remodel. Many owners in our Roswell service area choose the refresh once they see both numbers. Thinking about the bathroom next? Tell us, and we plan both so the second one costs less.

Kitchen remodeling by town

Guides

Questions about kitchen remodeling

  • How long will we be without a kitchen?

    Most of the planning happens while your old kitchen still works. Once it comes out, your written schedule shows the number of working days you are without it, and we can set up a simple stand-in kitchen with a sink, a fridge and a counter in another room.

  • Can we keep the same layout to save money?

    Often, yes. Keeping the sink, the range and the dishwasher where they are saves plumbing, wiring and vent work. We price your new layout and the current one side by side, so you see what a move costs before you decide.

  • Can you take out the wall between the kitchen and the dining room?

    Usually. If the wall carries weight from above, the plans call for a beam sized for it, and the permit covers the change. We check what the wall holds before we price it, so the estimate already includes the beam if one is needed.

Good to know before you book

  • 4.9 Sample rating
  • On paper firstthe layout, the scope and the price, before demolition
  • Every changein a signed change order before the work it covers
  • In writingthe price of the work, before any of it starts

Projects

Projects like this

Sample projects

  • Remodeled white kitchen with an island, pendant lights and wood floors

    Kitchen remodelRoswell

    Kitchen opened to the dining room, new cabinets and an island

    30 working days

    A closed-in kitchen in a brick colonial off Holcomb Bridge Road, with a wall between it and the dining room and cabinets that had seen better days. The plans took the wall out on a new beam, moved the sink to an island and kept the range where it was. The cabinets were ordered before demolition, so the family was without a kitchen for the shortest time we could manage.

  • White kitchen cabinets opening onto a bright dining and living room

    Kitchen remodelRoswell

    Main floor opened up: kitchen, dining and living room together

    40 working days

    An older house near the historic district with three small rooms on the main floor. Two walls came out on new beams, the kitchen moved to the middle of the floor and the dining area went by the windows. The work was phased so the family kept a working bathroom and a stand-in kitchen the whole time.

  • Kitchen with white shaker cabinets, stone counters and a dining nook

    Kitchen remodelAlpharetta

    Kitchen refresh in the same layout: counters, fronts and lighting

    10 working days

    Owners off Haynes Bridge Road who expected to need a full remodel of a builder-grade kitchen. The cabinet boxes were sound and the layout worked, so the estimate priced a refresh beside the remodel. They chose the refresh: new counters, refinished cabinet fronts, new hardware, under-cabinet lights and a new backsplash.

See the job map

What we check

What's really behind your walls

A remodel runs from the structure to the systems to the finishes you see, and most surprises start in a part you never see. Every estimate checks each one, and every quote prices them on their own lines.

  1. Structure

    The foundation, the framing and the beams. Moving a wall or adding a room starts here, and the plans show what each wall carries.

  2. Systems

    The plumbing, the wiring and the heating and cooling inside the walls. A remodel is the best time to update them, while the walls are open.

  3. Insulation

    What keeps the room comfortable and the bills down. Older walls often have little or none, and it goes in before the drywall.

  4. Walls, floors and ceilings

    Drywall, subfloor and trim. Soft floors and cracked plaster often point to water or movement behind them.

  5. Finishes

    The cabinets, counters, tile, fixtures and paint you see every day. They set much of the price and most of the look.

Reviews

What homeowners say about kitchen remodeling

4.9 Sample rating

Sample reviews

5 out of 5 stars

“Our kitchen was planned to the inch before anything came out. The schedule they gave us on day one is the one they kept, and the final bill matched the written price.”

Dana P., RoswellOctober 2026. Sample review
  • 5 out of 5 stars

    They priced our new layout and our old one side by side. Moving the sink cost more than we wanted, so we kept it, and the kitchen still feels like a new room.

    Paul D., Johns CreekAugust 2026. Sample review
  • 4 out of 5 stars

    Good work on our kitchen refresh at a fair price. The new counters came a week late, but they told us as soon as they knew and moved the schedule around it.

    Ken B., AlpharettaJuly 2026. Sample review
  • 5 out of 5 stars

    They set up a small stand-in kitchen in our dining room while ours was out. It sounds like a small thing, but it made the weeks without a kitchen easy.

    Omar E., RoswellJanuary 2026. Sample review

Where we work

The towns we cover

Kitchens, bathrooms and additions across North Fulton.

  • Roswell, GA

    From the older homes near the historic district to the brick-front colonials in the swim-and-tennis neighborhoods: closed-in kitchens, original bathrooms and basements waiting to be finished.

    3 sample projects

  • Alpharetta, GA

    Two-story homes with builder-grade kitchens, bonus rooms over the garage and walk-out basements: remodels that make the house fit how the family lives now.

    3 sample projects

  • Johns Creek, GA

    Larger homes on wooded lots with room to grow: primary suite additions, finished basements and kitchens opened to the family room.

    2 sample projects

Free estimate

Get your free estimate

The visit and the written estimate are free, with no obligation. Tell us about the room and we call you back to set a time to measure it.

(770) 555-0148

Mon to Fri 7:30 AM to 5 PM, Saturday estimates by appointment

Demo site: this form doesn't send yet.

Call nowFree estimate